Project Overview

Bion Electrical was appointed to deliver the electrical and mechanical refurbishment works for a major hotel upgrade project involving the refurbishment of guest bedrooms and public areas. Working alongside Murray & Willis Ltd

, the project formed part of a wider hospitality improvement programme focused on enhancing guest experience, modernising services, and improving the overall operational efficiency of the hotel environment.

Customer: Murray & Willis

Project: Bedroom and Lobby Refurbs

Valuation: £900,000

Sector: Hospitality

Scope of Works

Electrical Design & Planning

Development of a full electrical design tailored to the client’s requirements, ensuring the system layout and infrastructure supported both current needs and future expansion.

Strip-Out & Infrastructure Installation

Complete removal of existing services, followed by the installation of new containment systems for power, lighting, data, and fire/security throughout the building.

Plant Room & Service Distribution

Creation of a dedicated plant room to house distribution boards and mechanical plant, with power and services distributed across consultation rooms, offices, and associated spaces.

Testing, Commissioning & Handover

Comprehensive testing and commissioning of all installed systems, followed by a full client demonstration to confirm operational performance and project completion.

Challenges Presented

  • Delivering refurbishment works within a live hotel environment while maintaining uninterrupted guest services.
  • Coordinating phased works across occupied and operational areas of the building.
  • Upgrading existing electrical and mechanical systems within confined ceiling and service spaces.
  • Managing tight programme deadlines to ensure room availability and operational continuity.
  • Integrating modern energy-efficient systems into existing infrastructure without major structural disruption.
  • Maintaining strict health, safety, and noise control procedures throughout the refurbishment programme.

Solutions Implemented

Carefully phased delivery strategy to minimise disruption to hotel operations and ensure efficient progression across all refurbishment areas. Close coordination with the principal contractor and hotel management team enabled works to be scheduled around occupancy levels and operational requirements.

Energy-efficient LED lighting systems were introduced throughout the refurbished bedrooms and public spaces, improving both aesthetics and operational performance while reducing long-term energy consumption. Mechanical and electrical services were upgraded to provide improved reliability, occupant comfort, and compliance with modern hospitality standards.

The team utilised flexible working arrangements and detailed programme coordination to maintain progress within the live environment while ensuring all installations met the required quality and safety standards.